03Process
Drawings in. Steel up.
From take-off to erection, one team runs the job — planned around your programme dates.
Six stages
From your drawings to steel in the air.
Stage 01Enquiry & take-offSend us the drawings and the programme dates. We do the take-off and come back with questions before we come back with a number.Learn more
Stage 02QuoteA clear price against your engineer’s and architect’s scope — fabrication, treatment, delivery and erection, itemised.Learn more
Stage 03Shop detailingDetailed workshop plans tailored to your project, issued for your engineer’s approval before a single section is cut.Learn more
Stage 04FabricationCut, drilled, welded and assembled in our Yennora workshop, scheduled so output keeps pace with site, under our own quality checks.Learn more
Stage 05Surface treatmentPrepared and painted in-house to the specified finish, with compliances and warranties to Australian standards.Learn more
Stage 06Delivery & erectionOur trucks, our cranes, our crews. Steel lands when the programme says it lands, and goes up the same way.Learn more
Before we start
What to send us.
The more of this we have, the faster the take-off — and the fewer questions before a number.
- 01
Drawings
Engineer’s and architect’s drawings, in whatever revision you have.
- 02
Programme
Key dates and milestones, so fabrication and delivery can be planned around them.
- 03
Site
Suburb, access and any constraints on crane positions or delivery times.
- 04
Scope
Fabrication, paint specification, delivery and erection — whatever you need from us.
Start to finish
One team, shop to site.
No hand-offs between fabricator, painter, carrier and erector. Every stage runs through our Yennora yard, so the programme has one owner from first cut to final bolt.
- 01FabricateCut, drilled and welded in our Yennora workshop, with production scheduled around your site dates.
- 02PaintPrepared and painted in-house to the specified finish, as steel comes off the line.
- 03DeliverFull loads to site on our own trucks and trailers, when the programme needs them.
- 04ErectOur own crews, with our own 30 t and 70 t mobile cranes and access equipment.
Questions
How it works.
Drawings in whatever revision you have, the programme dates, the site suburb and access, and the scope — fabrication only, or painted, delivered and erected. Attach them to the quote form or email reception.
Yes. Detailed workshop plans are issued for your engineer’s approval before a single section is cut.
One team, shop to site. Fabrication, painting, delivery and erection all run through the Yennora yard, so the programme has one owner from first cut to final bolt.
Yes — book a phone or video call, a drawing review, a meeting at the yard or a site inspection online, at a time that suits you.